
w. Drew III- October 26, 2006 - Camden Reese- October 23, 2008

Posted by Rachael at 10:39 AM 3 comments
tumbled stone kitchen backsplash
backsplash and granite countertops
Drew & Camden's Jack N' Jill
Posted by Rachael at 9:44 PM 0 comments
Here are some updated pictures of the house: they put in the balusters on the stairs and that is about all that has happened since Friday. We got our weekly call from our builder this morning and she said that they are starting to tile today and that will take about 3 days. All bathroom showers and floors are tiled as well as the mud room and laundry room and the kitchen back splash is tumbled stone. After that they start painting and will be painting for about a week.
front stairs
Posted by Rachael at 12:54 PM 1 comments
the study built-in, love it!
the beloved mud bench!
Thursday update- the garage doors have been installed as well as the radiant barrier in the attic. Most all of the crown molding and door trim is done downstairs, as well as some of the doors are on. Upstairs they have started on the door frames and doors. The fireplace was installed and the french doors for the study were delivered. There was a guy asleep on the garage floor and a skid steer outside and it looked like they were clearing away the rest of the unused stone and brick.
Posted by Rachael at 8:29 PM 2 comments




Posted by Rachael at 10:15 AM 3 comments